-
Battery Transfer Cart
-
Trackless Transfer Cart
-
Rail Transfer Cart
-
AGV Automatic Guided Vehicle
-
Motorized Transfer Trolley
-
Electric Transfer Cart
-
Material Transfer Carts
-
Coil Transfer Cart
-
Mold Transfer Cart
-
Material Handling Solutions
-
Hydraulic Lifting Transfer Cart
-
Ladle Transfer Cart
-
Busbar Powered Transfer Cart
-
Transfer Cart Accessories
-
Industrial Mecanum Wheels
-
Electric Lifting Platform
-
CeyhanYou really are a 5 stars company. hope i can be a five stars client!
-
RaihanIt is Raihan from BD. 10 sets transfer cart has been debugged well. Thanks for careful and professional technique guidance in our factory. Hope everything can goes well and expect to next wonderful cooperation with you!
-
MohammedHi, it is my first time to come to China and visit the factory twice in one year, the excellent service moved me again and again and share many interesting things with me. And the item has started worked in our factory, glad to make cooperation with you.
Annealing Furnace Using 30 Ton Platform Trolley Railway
Place of Origin | Henan,China |
---|---|
Brand Name | BEFANBY |
Certification | CE, SGS, ISO9001 |
Model Number | KPT |
Minimum Order Quantity | 1 set/sets |
Price | Negotiation |
Packaging Details | Electrical parts will add shields. As required by the customer, we can add a fixed packing. |
Delivery Time | 40-50 days as usual delivery,30-40days for urgent delivery |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1500 set/sets per year |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xPower Supply | Mobile Cable | Running Distance | According To Customers' Demand |
---|---|---|---|
Running Speed | 0-20m/min | Color | Customized |
Load Capacity | 1-1500T | Warranty | 12 Months |
Product Name | Annealing Furnace Using 30 Ton Platform Trolley Railway | ||
High Light | Railway Electric Transfer Cart,30 Ton Electric Platform Trolley,Annealing Furnace Electric Platform Trolley |
Annealing Furnace Using 30 Ton Platform Trolley Railway
Brief Introduction Of Annealing Furnace Using 30 Ton Platform Trolley Railway
This cart is designed and manufactured based on the consider of annealing furnace application.The cart is made up of two carts: top cart and bottom cart,and these two carts running direction are vertical.The bottom cart is used to connect the annealing furnace.The bottom cart rails are connected with the rails in annealing after they are overturned.Overturned arm mounted on top cart is used to push and pull the equipment in furnace.This design avoid that the high temperature influences influences the electrical.Mobile rails and mobile overturning arm can automatically connect,which greatly increase the production efficiency.


Parts Of Annealing Furnace Using 30 Ton Platform Trolley Railway
Product Features Of Annealing Furnace Using 30 Ton Platform Trolley Railway
Advantage


Technique Parameter Of Annealing Furnace Using 30 Ton Platform Trolley Railway
Model | KPT-2t | KPT-5t | KPT-10t | KPT-16t | KPT-20t | KPT-25t | KPT-30t | KPT-40t | KPT-50t | KPT-63t | KPT-80t | KPT-100t | KPT-150t | |
Rated Load | 2 | 5 | 10 | 16 | 20 | 25 | 30 | 40 | 50 | 63 | 80 | 100 | 150 | |
Table size | Length(L) | 2000 | 3500 | 3600 | 4000 | 4000 | 4500 | 4500 | 5000 | 5500 | 5600 | 6000 | 6500 | 10000 |
Width(W) | 1500 | 2000 | 2000 | 2000 | 2200 | 2200 | 2200 | 2500 | 2500 | 2500 | 2600 | 2800 | 3000 | |
Height(H) | 450 | 450 | 500 | 500 | 550 | 600 | 600 | 650 | 650 | 750 | 800 | 850 | 1200 | |
Wheel Base | 1200 | 2500 | 2600 | 2800 | 2800 | 3200 | 3200 | 3800 | 4200 | 4300 | 4700 | 4900 | 7000 | |
Rail Inner Gauage | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1800 | 2000 | 2000 | |
Wheel Diameter | 270 | 300 | 300 | 350 | 350 | 400 | 400 | 500 | 500 | 600 | 600 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 75 | 75 | 75 | 75 | |
Running Speed | 25 | 25 | 25 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 18 | |
Motor Power | 0.8 | 1.5 | 1.5 | 2.2 | 2.5 | 3 | 4 | 5.5 | 5.5 | 7.5 | 7.5 | 11 | 15 | |
Max Wheel Load | 14.4 | 25.8 | 42.6 | 64.5 | 77.7 | 94.5 | 110.4 | 142.8 | 174 | 221.4 | 278.4 | 343.8 | 265.2 | |
Reference Weight | 2.3 | 3.3 | 3.8 | 5 | 5.5 | 6 | 6.3 | 7.2 | 7.6 | 10.3 | 12.1 | 13.9 | 26 | |
Recommended Rail Model | P15 | P18 | P18 | P24 | P24 | P38 | P38 | P43 | P43 | P50 | P50 | QU100 | QU100 |
Application
Delivery
Brief Introduction
